UAB Civitan Suite 329 Renovation Birmingham, AL
Renovation
Full Set
(click to expand/collapse)

Name | Size | ||
AD1-03-01 Demolition Plans | 144.1 KB | ||
AE1-03-01 Architectural Renovation Plans | 164.3 KB | ||
AO0-00-01 Architectural General Information | 148.4 KB | ||
AO0-00-02 Door And Frame Schedule Abbreviations | 139.4 KB | ||
CS Cover Sheet | 112.5 KB | ||
EO0-00-01 Electrical Symbol List | 127.4 KB | ||
EO0-00-02 Electrical Composite Plan - Third Floor | 111.6 KB | ||
EP4-03-01 Partial Electrical Plans - Third Floor | 184.3 KB | ||
EP7-00-01 Electrical Power Schedules | 426.6 KB | ||
EY5-00-01 Electrical Data Cabling Cat 6a | 132.2 KB | ||
FP1-03-01 Fire Suppression Plan Third Floor | 163.1 KB | ||
GC1-00-01 Construction Logistics Plan Third Floor | 213.7 KB | ||
GO1-03-01 General Information Life Safety Plan Third Floor | 225.0 KB | ||
IE1-03-01 Interior Design Plan First Floor | 362.7 KB | ||
MH1-03-01 Mechanical HVAC Plan Third Floor | 205.8 KB | ||
MH5-00-01 Mechanical Hvac Details | 136.1 KB | ||
MO0-00-01 Mechanical General Information | 324.8 KB |