Berry Middle School Athletic Restrooms & Storage Birmingham, AL

New Construction
Full Set (click to expand/collapse)
Order this section for $76.05
This is available for download to registered users. Log in now
Name Size
A100 First Floor And Reflected Ceiling Plans 230.4 KB
A102 Roof Plan 219.3 KB
A110 Enlarged Plans And Interior Elevations 695.6 KB
A111 Enlarged Plans And Interior Elevations 256.9 KB
A200 Exterior Elevations 384.4 KB
A300 Sections 404.8 KB
A301 Wall Sections 452.4 KB
A302 Details 303.8 KB
A303 Details 505.0 KB
A600 Interior Dimensional Info. 277.8 KB
A620 Finish, Material, Door And Frame Schedule 170.8 KB
C 1.0 Standard Legend And Abbreviations 195.0 KB
C 1.1 Erosion Control Sequence 167.3 KB
C 2.0 Existing Survey 505.9 KB
C 3.0 Grading, Drainage, Site, And Erosion Control Plan 471.7 KB
C 4.0 Utility Plan 566.3 KB
C 5.0 Erosion Control Details 471.9 KB
C 5.1 Miscellaneous Details 520.5 KB
C 5.2 ADS Detail 370.6 KB
CS Cover Sheet 413.8 KB
E001 Electrical Legend And Notes 213.2 KB
E002 Electrical Diagrams And Details 239.9 KB
E003 Electrical Details 268.1 KB
E004 Electrical Schedules 375.9 KB
E101 Site Electrical Plan 757.5 KB
E201 Electrical Plans 334.6 KB
LS100 Life Safety Code Review 229.7 KB
M001 Mechanical Legend, Schedules, Abbreviations, And Details 81.8 KB
M101 Athletic Restrooms And Storage Building Floor Plan Mechanical 46.0 KB
P001 Plumbing Legend, Schedules, And Abbreviations 50.5 KB
P101 Athletic Restrooms And Storage Building Floor Plan Plumbing - Gravity 58.4 KB
P201 Athletic Restrooms And Storage Building Floor Plan Plumbing - Pressure 56.8 KB
P301 Plumbing Details 70.6 KB
S0.1 General Notes & Special Inspections 215.4 KB
S0.2 Typical Details 329.7 KB
S0.3 Schedules 203.3 KB
S1.1 Foundation And Roof Framing Plan 222.9 KB
S5.1 Sections And Details 396.4 KB
T101 General Information 327.1 KB