2.1-01 - ReviewDocumentRegistry.xlsx
|
25.2 KB |
|
|
2.1-02 - Turnover and Commissioning Guideline.pptm
|
124.7 KB |
|
|
3-05-UtilityMatrixX.xlsx
|
21.3 KB |
|
|
3-07 - IT and Telecommunication room requirements
|
276.2 KB |
|
|
3-09-BuildingSystemsMonitoringandCOntrolInfrastructure
|
522.4 KB |
|
|
21 05 00-Common Work Results for Fire Suppression
|
108.0 KB |
|
|
21 05 23-General-Duty Valves for Water-Based Fire-Suppression Piping
|
103.6 KB |
|
|
21 05 48-Vibration and Seismic Controls for Fire Suppression Piping and Equipment
|
99.3 KB |
|
|
21 11 00-Facility Fire-Suppression Water-Service Piping
|
112.8 KB |
|
|
21 12 00-Fire-Suppression Standpipes
|
93.5 KB |
|
|
21 13 00-Fire-Suppression Sprinkler Systems
|
97.7 KB |
|
|
22 07 19-THERMAL INSULATION FOR PIPING
|
100.3 KB |
|
|
22 10 05-INDUSTRIAL AND DOMESTIC WATER PIPING SYSTEMS
|
113.4 KB |
|
|
22 10 05.02-INTERIOR SANITARY DRAINAGE SYSTEM
|
95.1 KB |
|
|
22 10 05.03-INTERIOR STORM DRAINAGE SYSTEM
|
105.9 KB |
|
|
22 10 06-PLUMBING SPECIALTIES
|
87.9 KB |
|
|
22 15 02-AIR PIPING SYSTEMS (6 BAR)
|
112.6 KB |
|
|
22 15 03-ARGON GAS PIPING SYSTEMS
|
96.8 KB |
|
|
22 30 00-PLUMBING EQUIPMENT
|
95.1 KB |
|
|
22 40 00-PLUMBING FIXTURES
|
99.5 KB |
|
|
23 01 00-GENERAL MECHANICAL REQUIREMENTS - PREPURCHASE EQUIPMENT
|
99.4 KB |
|
|
23 05 13-GENERAL ELECTRICAL AND MOTOR REQUIREMENTS
|
97.0 KB |
|
|
23 05 48-VIBRATION ISOLATION AND SOUND-FIRE ATTENUATION
|
103.5 KB |
|
|
23 05 93-MECHANICAL SYSTEM TEST AND BALANCE
|
95.3 KB |
|
|
23 07 13-THERMAL INSULATION FOR DUCTWORK
|
99.9 KB |
|
|
23 09 23-CONTROLS SYSTEMS
|
138.4 KB |
|
|
23 09 34-VARIABLE FREQUENCY AC DRIVES
|
103.1 KB |
|
|
23 21 13-HYDRONIC WATER PIPING SYSTEMS
|
103.4 KB |
|
|
23 21 14-HYDRONIC WATER PIPING SPECIALTIES
|
106.2 KB |
|
|
23 21 23-CIRCULATING PUMPS
|
95.2 KB |
|
|
23 23 00-Refrigeration Piping Systems
|
94.2 KB |
|
|
23 25 00-CHEMICAL WATER TREATMENT
|
127.9 KB |
|
|
23 31 00-DUCTWORK AND SHEET METAL SPECIALTIES
|
103.4 KB |
|
|
23 33 13-AIR MOVING EQUIPMENT
|
98.2 KB |
|
|
23 35 02-WELD FUME EXHAUST DUCTWORK
|
130.0 KB |
|
|
23 55 33-HEATING EQUIPMENT
|
98.0 KB |
|
|
23 74 16-MODULAR HEATING, VENTILATING, AND COOLING UNITS
|
120.4 KB |
|
|
23-CP921 VW 36 Bay Battery RFQ Specifications
|
7.9 MB |
|
|
26 01 00-ELECTRICAL GENERAL PROVISIONS
|
94.9 KB |
|
|
26 05 00-BASIC MATERIALS AND METHODS FOR ELECTRICAL WORK
|
103.2 KB |
|
|
26 05 13-CABLE FOR CIRCUITS OVER 600 VOLTS
|
106.7 KB |
|
|
26 05 19-WIRES AND CABLE (600 VOLTS AND LESS)
|
103.4 KB |
|
|
26 05 20-MANUFACTURED WIRING SYSTEMS
|
95.5 KB |
|
|
26 05 26-GROUNDING
|
86.1 KB |
|
|
26 05 33.13-RACEWAYS
|
111.3 KB |
|
|
26 05 33.16-CABINETS, BOXES, AND FITTINGS
|
94.6 KB |
|
|
26 05 36-CABLE TRAYS
|
95.7 KB |
|
|
26 05 53-ELECTRICAL IDENTIFICATION
|
94.8 KB |
|
|
26 05 73-Power System Studies
|
106.0 KB |
|
|
26 05 75-ELECTRICAL ACCEPTANCE TESTS
|
104.5 KB |
|
|
26 09 16-CONTROL STATIONS AND DEVICES
|
99.6 KB |
|
|
26 11 16-INDOOR 480-VOLT UNIT SUBSTATIONS
|
137.2 KB |
|
|
26 22 00-DRY-TYPE TRANSFORMERS FOR 600 VOLT AND BELOW
|
78.6 KB |
|
|
26 24 16-PANELBOARDS
|
103.7 KB |
|
|
26 25 13-BUSWAY
|
214.0 KB |
|
|
26 27 13-POWER MONITORING SYSTEM
|
108.7 KB |
|
|
26 27 26-WIRING DEVICES
|
92.1 KB |
|
|
26 28 13-FUSES FOR 600V AND LESS SYSTEMS
|
79.3 KB |
|
|
26 28 16-MOTOR STARTERS AND SAFETY SWITCHES
|
100.4 KB |
|
|
26 41 00-Lightning Protection for Structures
|
97.7 KB |
|
|
26 51 00-LIGHTING SYSTEMS
|
104.3 KB |
|
|
28 10 00-ACCESS CONTROL SYSTEM
|
117.6 KB |
|
|
28 46 00-DIGITAL ADDRESSABLE FIRE ALARM SYSTEMS
|
155.2 KB |
|
|
Battery Assembly Plant
|
3.8 MB |
|
|
Chapter 1 - Instructions to Bidders
|
304.0 KB |
|
|
Chapter 2.1 - Design Scope of Work
|
307.7 KB |
|
|
Chapter 3 - BASIS OF DESIGN
|
433.9 KB |
|
|
Chapter 3 - Cover Sheet BOD
|
133.3 KB |
|
|
CM-Lodestar-Manual-Generic-2020-Feb-192063792-Rev-AB
|
3.9 MB |
|
|
cm_635_series_motor_driven_trolley_2007_sept_635-j
|
660.4 KB |
|
|
fs-jib
|
1.0 MB |
|
|
Midwest Letter_Battery 2020-01-28
|
171.3 KB |
|
|
P_2 2_CI-T_003 Color Concept REV2
|
3.2 MB |
|
|
P_2.2_CI-T_001 Commissioning Procedure
|
381.0 KB |
|
|
Report of proposed Geotechnical Exploration - Volkswagen Battery Plant
|
4.2 MB |
|
|
Table of Contents 09-06-2024 11-56-9 AM
|
45.0 KB |
|
|
TransmittedDocumentList_VW_NewBattery_CP2.xlsx
|
21.0 KB |
|
|
VW Final Geotechnical Report
|
45.8 MB |
|
|
VWGoA_Furniture_Catalog_April2017.ppt
|
7.2 MB |
|