Upfit for WSSU Union Station (2nd Floor) Winston Salem, NC
Remodel
Full Set
(click to expand/collapse)
Name | Size | |||
A0.1 Union Station 2nd Floor Plan | 741.5 KB | |||
A0.2 Life Safety Plan Second Floor | 593.2 KB | |||
A 1.1 Demolition Plan Second Floor | 239.0 KB | |||
A 1.2 Floor Plan - Second Floor | 288.9 KB | |||
A 1.4 Furniture Plops Plan | 431.3 KB | |||
A2.1 Door And Frame Schedule | 427.4 KB | |||
A22 Room Finish Schedule | 312.7 KB | |||
E.01 Partial Fire Alarm Riser | 604.2 KB | |||
E1.1 Electrical - Drop Detail | 723.6 KB | |||
E2.1 Demolition Notes | 508.4 KB | |||
E3.1 Electrical 2nd Level - HVAC Power | 399.5 KB | |||
M0.1 Mechanical Cover Sheet | 1.0 MB | |||
M0.2 Mechanical Specificationss | 296.2 KB | |||
M1.1 Plan - Second Floor Demolition Plan-Vre | 350.3 KB | |||
M2.1 Second Floor New Work Plan-vrf | 334.6 KB | |||
M2.2 Second Floor New Work Plan-duct | 288.0 KB | |||
M4.1 Mechanical Schedules | 643.6 KB | |||
M5.1 Mechanical Details | 419.6 KB | |||
Ml.2 Plan - Second Floor Demolition Plan-Duct | 301.8 KB | |||
P0.1 Plumbing Drawing Index | 900.4 KB | |||
P0.2 Plumbing Specificationss | 286.7 KB | |||
P1.1 Plan - Second Floor Demolition Plan | 230.7 KB | |||
P2.1 Plan - Second Floor | 337.8 KB | |||
P2.2 Plan - Second Floor | 230.8 KB |