Progress Village South Fire Station #48 Riverview, FL

New Construction

Status

Bidding Closed

Bid Date 3/13/25 2:00pm

Company

...

Location

7412 South 78th, Riverview, FL 33578

Construct a new 2-Bay fire station approximately 7,558 sq. ft. The work includes but is not limited to all associated on-site and off-site improvements such as access drives, parking lot, dumpster enclosure, sign, flagpole, landscaping, irrigation, storm drainage system, sidewalks, fences, refueling facility, and all necessary utilities including lift station with force main and water main with jack and bore under 78Th Street, plus a back-up generator, concrete/masonry, cabinetry, wood trusses, cement board lap siding, epoxy floor, shingles roofing, doors and hardware, impact rated glass and glazing, impacted rated overhead doors, interior finishes, specialties, fire sprinkler system, Fire Alerting System, plumbing, HVAC and electrical.  NOTE: There are 4 Alternates