Amazing Explorers Academy Harmony, FL
Status
Accepting Bids
Bid Date | 11/22/24 5:00pm |
Company
Location
E Irlo Bronson Memorial Hwy & Botanic Blvd Harmony, FL 34773
Ground-up construction of a preschool. The building area is 12,246 SF. The project includes Erosion Control, Grading, Trenching, Site Demolition, Sawcutting, Site Concrete, Asphalt, Landscaping, Signage, Striping, Dumpster Enclosure, Fencing, Cleaning, , Dumpsters, Portable Toilets, Structural Concrete, Masonry, Storefront, Structural Steel, Roofing, Gutters, Windows, Painting, Flooring, HVAC, Electrical, Plumbing, Low voltage, Fire Alarm, Sprinkler, Framing & Drywall, Acoustical Ceilings, Carpentry, Doors and Hardware, Toilet Accessories, Millwork, and Fixture Installation. The remodeled area includes a Lobby/Reception, Classrooms, Office, Break Room, Kitchen, and Restrooms. The project begins on 12/10/2024 and ends on 08/15/2025.