Hanahan Water Treatment Plant Process Control Facility Hanahan, SC
Status
Bidding Closed
Bid Date | 10/25/24 5:00pm |
Company
Location
1104 Hanahan Road, Hanahan, SC 29410
As a reminder, Please send all your RFIs A.S.A.P before the RFIs Due date on Oct 15, 2024.
Good afternoon. I will be taking over this bid package moving forward. In the next several days, I will call you to check in and introduce myself. If you have any questions in the meantime, please do not hesitate to reach out to me at 703-501-9515 or kyle.babirak@clarkconstruction.com.
1. This Project consists of the relocation of the Hanahan Water Treatment Plan
(HWTP) Process Control Facility from the current location in the Stoney Filter
Building to the existing Filter Gallery (upper floor) in the existing Stoney Filter
Annex. Renovations to the existing Filter Gallery will include the addition of a
new plant control room, conference room, sample tap room, kitchen, mud room,
restrooms, shower, file storage space, janitor room, and associated improvements
to HVAC, plumbing, electrical, and SCADA system.
2. This Project will also include the installation of one (1) new sanitary sewer pump
station (SSPS), as well as associated gravity sanitary sewer line and sanitary
sewer forcemain tie-in.