CEFCO 0437 Crestview FL

New Construction

Status

Accepting Bids

Bid Date7/16/24 4:00pm

Company

...

Location

HWY 90 & Old Bethel Rd. Crestview, FL 32536

SCOPE:

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: 2.75 AC
Building SF: 5,974 SF
Structural Type: Bar Joist & Decking
Brief Project Description: Ground up CEFCO. Steel and ACM by JIMCO. Install owner provided Fuel Tanks. Concrete paving throughout site and DOT paving in ROW. Stone and EFIS exterior. Tile and Epoxy flooring at interior.

2. Site Construction
2-a Asbestos abatement Yes
2-c Erosion Control Yes
2-d Sitework, Grading Yes- Please Read the Geo Report and Price Accordingly for th Upper 4 Feet of Potentially Wet Soils
2-f Site Utilities (Storm, Water, Sewer) Yes- Please Include Underground Detention (C09 for Details)/Please Include Grease Trap/ Please Include Drains at Canopy Tied to Underground Storm
2-g Septic System Yes
2-h Fueling System Yes
2-j Striping & Site Signage Yes- Please include Thermo in ROW Areas
2-k Asphalt paving Yes- Please Include Full Depth Friction Course and Decel DOT Lane/Please include traffic control
2-m Landscaping Yes
2-n Irrigation Yes
2-o Retaining Wall Yes
2-p Fencing Yes - Privacy Fencing/Fencing at Retaining Wall
2-q NPDES Monitoring Yes
2-r Surveying Yes
2-s Construction Material Testing Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes- 3000/4000/4500 PSI
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes
3-g Rebar / Wire Mesh Yes

4. Masonry
4-e Masonry Turnkey Yes- Dumpster Enclosure/ Generator Enclosure/ Please Include Canopy Columns

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-h Kitchen Equipment (Install Only) Yes

7. Thermal and Moisture Protection
7-a Roofing - TPO, Duralast, Flat Roof Yes - TPO Firestone 60 MIL Over Minimum 5" ISO. 20 Year NFL with 15 Yeasr Manufacturer Warranty
7-f Stucco or EFIS Yes
7-j Metal Building Insulation Yes
7-k Caulking Yes

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-e Storefront & Glass Yes - Similar to Kawneer "FA-SET S.S.G"

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote (Including Parapet)/Please include Rigid Insulation Behind Stone/Please include Tyvek/Please include all necessary Plywood
9-e Flooring (Ceramic or Quarry Tile) Yes - Interceramics (Please include Vinyl Base)
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes - Epoxy Coated Floor Sealant (Flowcrete-Flowfresh) and Sealed Concrete
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes
10-d Awnings Yes - Prefab Awnings
10-j Speciality Outdoor Seating (picnic tables, benches, et) Yes- ADA Picnic tables
10-k Interior Signage (*signify if install only) Yes - Install
10-l Exterior Building Signage (*signify if install only) Yes - Install

15. Mechanical
15-a Plumbing Yes
15-e HVAC Turnkey Yes
15-f Refrigeration Yes
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes- Please include install of the ATS generator
16-f Low Voltage Wiring Yes