5223 Amazon Transfer Switch Elizabethtown, PA

Renovation

Status

Bidding Closed

Bid Date7/1/24 12:00pm

Company

...

Location

10 Industrial Road Elizabethtown, PA 17022

Description:

OPEN SHOP 

Phase 2 - Manual Transfer Switch Installation for Mobile Generation Interconnection (Site primary voltage:  12.4kV) 

The project includes sitework, concrete, landscaping, trenching, cables/conduits, electrical, etc. per the attached (10) plans. 

  • Your company must work on all Avetta Prequalification Requirements, Bolt Program is required for performing monthly safety audits and safety incident reporting, and BIM 360 is the project management software platform for your company to conform to all of these requirements.

  •  

  • Your company to conform to and is required to follow all of the (2) construction safety items as listed in the attached (23) documents and no exceptions or deviations are allowed.