C. Robert Markham Elementary School (Pompano Beach, FL)

Bid Date: Jul 8, 2020 at 2:00 PM

Project Location:
1501 NW 15th Avenue
Pompano Beach, FL 33069
Project Type: Renovations
Project Size (sq/ft): 50,000 to 100,000
Bid Status: OPEN
Special Instructions:
Work of this Contract comprises general construction of or renovations as follows and as described in the drawings: • Site: Replacement of the entire fire alarm system and related components. • Site: Repairs to existing aluminum covered walkways. • Site: Repairs to existing concrete covered walkways. • Building 1: Reroofing, HVAC equipment replacement, and fire alarm system replacement. • Building 2: Reroofing, HVAC equipment replacement, and fire alarm system replacement. • Building 3: Reroofing, window replacement, HVAC equipment replacement, fire alarm system replacement, and added egress doors. • Building 4: Reroofing, window replacement, HVAC equipment replacement, fire alarm system replacement and added egress doors. • Building 5: Reroofing, window replacement, HVAC equipment replacement, fire alarm system replacement and added egress doors. • Building 6: Reroofing and HVAC equipment replacement and fire alarm system replacement. • Building 7: Reroofing, window replacement, HVAC equipment replacement, and fire alarm system replacement. • Building 8: Reroofing, HVAC equipment replacement and fire alarm system replacement. • Building 78: Reroofing, exterior painting and fire alarm system replacement. • Buildings (4) 99: Fire alarm system replacement only. • Chiller Yard Improvements Included in the reroofing: • Remove abandoned rooftop equipment and close unneeded openings in the roof deck, if any. • Correct current deficiencies in roof drainage. • Replace horizontal and vertical roofing expansion joints. • Upon removal of existing roofing membrane, inspect roof deck. Where found damaged or deteriorated, advise the owner and coordinate with the owner and the unit price schedule Document 436. • All existing curbs will be replaced to coordinate with the new roofing system. • All rooftop equipment will receive Raise the stands for the rooftop equipment to provide a minimum of 24” clearance from the bottom of the supports to the new finished roofing surface (if and where such clearance would not be provided after installation of new insulation/roofing system), and provide new curbs for curb-mounted rooftop equipment in order to provide minimum height of 18 inches from the new finished roofing surface to the top of the curb. Provide hurricane tie-down straps at rooftop equipment if and where missing. • Raise existing plumbing vents as required to provide proper flashing

Specification Manual: Yes
Sheet Size: 24 x 36

ADDENDA:
  • Addendum #1 - Date Added: Jun 17, 2020
  • Addendum #2 - Date Added: Jul 6, 2020
  • Addendum #3 - Date Added: Jul 6, 2020
  • Addendum #4 - Date Added: Jul 6, 2020
  • Addendum #5 - Date Added: Jul 6, 2020

Contractors

1011 Sunnybrook Rd. Suite 905
Miami, FL 33136


Project Manager
Sathish Mamidi
Phone: (305) 381-8421, ext 114
Email: Click Here to Email


Project Files

Select which prints you want to purchase

Drawings for this project are in the categories listed below. To purchase a complete set of prints by set, please check the box beside the set. To purchase a partial set, click on "Show files" and check the boxes next to the desired drawings. Clicking on the drawing name will open a preview of the drawing. Please be sure the boxes are checked beside the prints to be shipped.

Specifications are available. Please select which divisions you want to purchase

Division 0
Division 1
Division 2
Division 3
Division 4
Division 5
Division 6
Division 7
Division 8
Division 9
Division 10
Division 11
Division 12
Division 13
Division 14
Division 15
Division 16
Division 17
Division 18
Division 19
Division 20
Division 21
Division 22
Division 23
Division 24
Division 25
Division 26
Division 27
Division 28
Division 29
Division 30
Division 31
Division 32
Division 33