Crooked River Elementary School - Phase 1 (St. Marys , GA)

Bid Date: Mar 26, 2020 at 2:00 PM

Project Location:
3570 Charlie Smith Sr. Hwy
St. Marys , GA 31558
Project Type: Renovations
Project Size (sq/ft): 50,000 to 100,000
Bid Status: OPEN
Special Instructions:
Please note this phase is only for HVAC & Steelwork. Phase 2 will include the remaining scope of work. We will host a prebid meeting introducing the entire project at Matilda Harris Elementary School on February 11, 2020 at 10:00am.

Specification Manual: Yes
Sheet Size: 30 x 42

ADDENDA:
  • Addendum #1 - Date Added: Feb 28, 2020
    Notes: Please note that HVAC bid in a separate phase. All other trades will bid on March 26, 2020, at 2:00 PM.
  • Addendum #2 - Date Added: Mar 25, 2020

Contractors

1 Cone Street
Statesboro, GA 30458

Fax: 912-764-9408
Website: Click Here

Project Manager
Savanna Page
Phone: (912) 764-6138
Email: Click Here to Email


Project Files

Select which prints you want to purchase

Drawings for this project are in the categories listed below. To purchase a complete set of prints by set, please check the box beside the set. To purchase a partial set, click on "Show files" and check the boxes next to the desired drawings. Clicking on the drawing name will open a preview of the drawing. Please be sure the boxes are checked beside the prints to be shipped.

Specifications are available. Please select which divisions you want to purchase

Division 0
Division 1
Division 2
Division 3
Division 4
Division 5
Division 6
Division 7
Division 8
Division 9
Division 10
Division 11
Division 12
Division 13
Division 14
Division 15
Division 16
Division 17
Division 18
Division 19
Division 20
Division 21
Division 22
Division 23
Division 24
Division 25
Division 26
Division 27
Division 28
Division 29
Division 30
Division 31
Division 32
Division 33