Morrow High School (Jonesboro, GA)

Bid Date: Dec 16, 2019 at 2:00 PM

Project Location:
Steele Road
Jonesboro, GA 30294
Project Type: Replacement
Project Size (sq/ft): more than 100,000
Bid Status: OPEN
Special Instructions:
DESCRIPTION OF PROJECT: Construction of a new 344,727 sqft replacement high school to be located on Steele Rd. Jonesboro, GA 30236 including site work and athletic fields. PROJECT CONSISTS OF BUT NOT LIMITED TO THE FOLLOWING: Sitework, site demolition, cast-in-place concrete, masonry, structural steel framing, steel joisting & decking, cold-formed metal framing, plastic-laminate-clad architectural cabinets, flush wood paneling, self-adhering sheet waterproofing, crystalline waterproofing, thermal insulation, EIFS, fluid-applied membrane air barriers, metal composite wall panels, SBS modified roofing, sheet metal flashing and trim, roof expansion joints, roof accessories, applied fireproofing, intumescent fireproofing, firestopping, fire-resistive joint systems, joint sealants, expansion control, hollow metal doors and frames, flush wood doors, FRP doors, coiling counter doors, overhead coiling doors, overhead coiling fire curtain, wood sound control door assemblies, aluminum-framed entrances and storefronts, glazed aluminum curtain walls, door hardware, glazing, mirrors, non-structural metal framing, gypsum board, tiling, acoustical panel ceilings, suspended decorative grids, wood athletic flooring, resilient tile flooring, resilient base and accessories, resilient athletic flooring, resinous matrix terrazzo flooring, resinous flooring, tile carpeting, sound-absorbing wall & ceiling units, interior painting, high performance coatings, visual display units, display cases, dimensional letter signage, phenolic-core toilet compartments, operable partitions, toilet, bath, and laundry accessories, fire protection cabinets, fire extinguishers, metal lockers, metal storage shelving, walkway coverings, flagpoles, appliances, foodservice equipment, food storage equipment, media center equipment, projection screens, lab fume hoods, kilns, gymnasium equipment, scoreboards, vertical louver blinds, roller window shades, lab casework, solid surfaces countertops, fixed arena seating, stadium bench seating, telescopic bleachers, hydraulic elevators, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, termite control, aggregate piers, exterior improvements, asphalt paving, decorative concrete paving, synthetic grass surfacing, site furnishings, plant irrigation, turf grassing & plants, site water, storm drainage, subdrainage systems and site sanitary sewer.

Specification Manual: Yes
Sheet Size: 30 x 42

ADDENDA:
  • Addendum #1 - Date Added: Nov 27, 2019
  • Addendum #2 - Date Added: Dec 3, 2019
  • Addendum #3 - Date Added: Dec 9, 2019
  • Addendum #4 - Date Added: Dec 9, 2019
  • Addendum #5 - Date Added: Dec 11, 2019
    Notes: The Bid Date has been changed to December 16, 2019, at 2:00 PM.

Contractors

2802 GA Hwy 17 Alt.
Toccoa, GA 30577

Fax: 706-886-3010
Website: Click Here

Project Manager
David Keener--Bowen and Watson
Phone: 706-886-3197
Phone: 706-886-3010
330 Main Street
Gainesville, GA 30501

Fax: 770-534-3799
Website: Click Here

Project Manager
Rachel Rogers - Carroll Daniel
Phone: (770) 536-3241, ext 1096
Email: Click Here to Email
635 NW Frontage Rd
Augusta, GA 30907

Fax: 706-863-2031

Project Manager
Brooks Blumenthal
Phone: (706) 863-7784
Email: Click Here to Email
191 Peachtree St NE Suite 2100
Atlanta, Ga 30303

Fax: 404-588-0572

Project Manager
Samuel Elrod - Senior Estimator
Phone: 470-249-1008 (c)
Email: Click Here to Email


Project Files

Select which prints you want to purchase

Drawings for this project are in the categories listed below. To purchase a complete set of prints by set, please check the box beside the set. To purchase a partial set, click on "Show files" and check the boxes next to the desired drawings. Clicking on the drawing name will open a preview of the drawing. Please be sure the boxes are checked beside the prints to be shipped.

Specifications are available. Please select which divisions you want to purchase

Division 0
Division 1
Division 2
Division 3
Division 4
Division 5
Division 6
Division 7
Division 8
Division 9
Division 10
Division 11
Division 12
Division 13
Division 14
Division 15
Division 16
Division 17
Division 18
Division 19
Division 20
Division 21
Division 22
Division 23
Division 24
Division 25
Division 26
Division 27
Division 28
Division 29
Division 30
Division 31
Division 32
Division 33