Saint Vincent de Paul Atlanta Headquarters (Tucker, GA)

Bid Date: Sep 13, 2019 at 2:00 PM

Project Location:
2050 Chamblee Tucker Road
Tucker, GA 30341
Project Type: Renovation
Project Size (sq/ft): 20,000 to 49,999
Bid Status: OPEN
Specification Manual: Yes
Sheet Size: 30 x 42

ADDENDA:
  • Addendum #1 - Date Added: Sep 5, 2019
    Notes: There are no MEP drawings included in the issued drawing sets. In lieu of these, the architect has included plumbing and lighting fixture cut sheets, and has noted the fixture locations on the "I" drawings. Specifically, sheets I1.11 shows the power locations and sheet I1.12 shows the lighting fixtures. The plumbing fixtures are labeled on the enlarged details. Please provide MEP pricing based on this limited information. We will have some input on the final MEP designs.

Contractors

6111 Peachtree Dunwoody Road, Building B, Suite 102
Atlanta, GA 30328

Fax: 770-392-0203

Project Manager
Tim Fulmer - Director of Estimating
Phone: 770-391-1993
Fax: 770-392-0203
Email: Click Here to Email


Project Files

Select which prints you want to purchase

Drawings for this project are in the categories listed below. To purchase a complete set of prints by set, please check the box beside the set. To purchase a partial set, click on "Show files" and check the boxes next to the desired drawings. Clicking on the drawing name will open a preview of the drawing. Please be sure the boxes are checked beside the prints to be shipped.

Specifications are available. Please select which divisions you want to purchase

Division 0
Division 1
Division 2
Division 3
Division 4
Division 5
Division 6
Division 7
Division 8
Division 9
Division 10
Division 11
Division 12
Division 13
Division 14
Division 15
Division 16
Division 17
Division 18
Division 19
Division 20
Division 21
Division 22
Division 23
Division 24
Division 25
Division 26
Division 27
Division 28
Division 29
Division 30
Division 31
Division 32
Division 33