Carr Road Pump Station and Force Main

Bid Date: Jul 9, 2019 at 2:00 PM

Project Location:
Greenville County, SC
Project Size (sq/ft): 5,000 to 9,999
Special Instructions:
This project consists of the construction of a 550-gpm duplex submersible pump station and associated site improvements; approximately 7,200 linear feet (LF) of 8-inch sanitary sewer force main; approximately 3,900 LF of 12-inch sanitary sewer force main; and approximately 175 LF of 12-inch sanitary sewer gravity main. Work includes the installation of sewer mains by both open cut and jack-and-bore methods, driveway and pavement repairs where necessary, and SCDOT-approved traffic control for open cut crossing of Blakely Avenue. Work within the proposed Harvest Glen subdivision will be performed within future road right-of-way; all other proposed work will be performed within SCDOT right-of-way.

Specification Manual: Yes
Sheet Size: 24 x 36

ADDENDA:
  • Addendum #1 - Date Added: Jul 3, 2019

Contractors

Greenville, SC 29601


Project Manager
Lee Brackett - Thomas & Hutton
Phone: 864-412-2221
Email: Click Here to Email


Project Files

Select which prints you want to purchase

Drawings for this project are in the categories listed below. To purchase a complete set of prints by set, please check the box beside the set. To purchase a partial set, click on "Show files" and check the boxes next to the desired drawings. Clicking on the drawing name will open a preview of the drawing. Please be sure the boxes are checked beside the prints to be shipped.

Specifications are available. Please select which divisions you want to purchase

Division 0
Division 1
Division 2
Division 3
Division 4
Division 5
Division 6
Division 7
Division 8
Division 9
Division 10
Division 11
Division 12
Division 13
Division 14
Division 15
Division 16
Division 17
Division 18
Division 19
Division 20
Division 21
Division 22
Division 23
Division 24
Division 25
Division 26
Division 27
Division 28
Division 29
Division 30
Division 31
Division 32
Division 33