Firestone Complete Auto Care (Lexington, KY)

Bid Date: May 2, 2019 at 5:00 PM

Project Location:
2159 Paul Jones Pkwy.
Lexington, KY 40509
Project Type: New Construction
Project Size (sq/ft): 5,000 to 9,999
Bid Status: OPEN
Special Instructions:
Project is ground-up, new construction requiring the following scopes of work: Survey and Construction Layout, Erosion Control, Clear and Grubbing, Rough and Fine Grading, Underground Utilities, Asphalt Paving, Striping, Pavement Markings and Signage, Landscaping and Irrigation, Dumpster Gates, Site and Building Concrete, Masonry, EIFS, Sealed and Polished Concrete, PEMB, PEMB Erection, Insulation, Nichiha Siding, Awnings, Rough and Finish Carpentry, Storefront, Overhead Doors, Metal Stud Framing, Drywall, Painting, FRP, Fire Alarm, Intrusion Alarm, Rough and Finish Plumbing, HVAC, and Rough and Finish Electric. Construction activities tentatively set to begin mid-June 2019 and run through mid-November 2019. Please submit proposals by the end of the business day on 5/2/2019.

Specification Manual: Yes
Sheet Size: 24 x 36

Contractors

4840 Geminus Drive, Suite 102
Chattanooga, TN 37416


Project Manager
Tim Soard
Phone: (423) 641-0826 x114
Fax: (423) 641-0827
Email: Click Here to Email


Project Files

Select which prints you want to purchase

Drawings for this project are in the categories listed below. To purchase a complete set of prints by set, please check the box beside the set. To purchase a partial set, click on "Show files" and check the boxes next to the desired drawings. Clicking on the drawing name will open a preview of the drawing. Please be sure the boxes are checked beside the prints to be shipped.

Specifications are available. Please select which divisions you want to purchase

Division 0
Division 1
Division 2
Division 3
Division 4
Division 5
Division 6
Division 7
Division 8
Division 9
Division 10
Division 11
Division 12
Division 13
Division 14
Division 15
Division 16
Division 17
Division 18
Division 19
Division 20
Division 21
Division 22
Division 23
Division 24
Division 25
Division 26
Division 27
Division 28
Division 29
Division 30
Division 31
Division 32
Division 33