Riverwood High School - Phase 3-8 Auditorium/Gymnasium (Sandy Springs, GA)

Bid Date: Dec 7, 2018 at 2:30 PM

Project Location:
5900 Raider Drive
Sandy Springs, GA 30328
Project Type: Addition
Project Size (sq/ft): more than 100,000
Bid Status: OPEN
Sheet Size: 30 x 42

Contractors

3200 Cobb Galeria Pkwy, Ste 240
Atlanta, GA 30339

Fax: 678-244-6565
Website: Click Here

Project Manager
Hunter Letts - Evergreen Construction
Phone: 678-244-6500 X6512
Fax: 678-244-6565
Email: Click Here to Email


Project Files

Select which prints you want to purchase

Drawings for this project are in the categories listed below. To purchase a complete set of prints by set, please check the box beside the set. To purchase a partial set, click on "Show files" and check the boxes next to the desired drawings. Clicking on the drawing name will open a preview of the drawing. Please be sure the boxes are checked beside the prints to be shipped.