South Fulton Transportation & Maintenance Facility

Bid Date: Sep 24, 2018 at 2:00 PM

Project Location:
107 Heath Street
Fairburn, GA 30213
Project Type: New Construction
Project Size (sq/ft): 20,000 to 49,999
Bid Status: OPEN
Specification Manual: Yes
Sheet Size: 30 x 42

ADDENDA:
  • Addendum #1 - Date Added: Sep 14, 2018
    Notes: New bid date is 09/24/2018 by 2:00 pm

Contractors

412 Sangamore Road
Breman, Ga 30110

Fax: 770-537-1837
Website: Click Here

Project Manager
Rachel Wheeler - R. K. Redding Construction Inc
Phone: 770.537.1845
Fax: 770.537.1837
Email: Click Here to Email
5075 Avalon Ridge Parkway
Norcross, GA 30071

Fax: 770-242-3100

Project Manager
Amy Sue Mann - Hogan Construction
Phone: 770-242-8588
Fax:
Email: Click Here to Email
3800 Camp Creek Parkway
Atlanta, GA 30331

Fax: 770-907-9461

Project Manager
Tan Ta - Triad Construction
Phone: 770-907-9300
Fax: 770-907-9461
Email: Click Here to Email
3200 Cobb Galeria Pkwy, Ste 240
Atlanta, GA 30339

Fax: 678-244-6565
Website: Click Here

Project Manager
Amanda Moran - Evergreen Construction
Fax:
Email: Click Here to Email
101 Parkwood Circle
Carrolton, GA 30117

Fax: 770-834-5265

Project Manager
Matt Plemmons - Ra-Lin
Phone: (770) 834-4884
Fax: (770) 834-5265
Email: Click Here to Email


Project Files

Select which prints you want to purchase

Drawings for this project are in the categories listed below. To purchase a complete set of prints by set, please check the box beside the set. To purchase a partial set, click on "Show files" and check the boxes next to the desired drawings. Clicking on the drawing name will open a preview of the drawing. Please be sure the boxes are checked beside the prints to be shipped.

No files available at this time. Please contact your LDI Store.