Cypress Bay High School - Phase I (Weston, FL)

Bid Date: Mar 6, 2018 at 4:00 PM

Project Location:
18600 Vista Park Blvd.
Weston, FL 33332
Project Type: Renovation & Repairs
Project Size (sq/ft): more than 100,000
Bid Status: 3
Special Instructions:
Trades needed: Demolition, Roofing, Mechanical, Mechanical Controls, HVAC, Pipe Insulation, Test and Balance, Electrical, Lightning Protection, Fire Alarm, Gypsum Board, Fire Stopping, Interior Cleaning. USE THE BID PROPOSAL FORM FOR BIDDING; DO NOT USE YOUR OWN FORM. All bids that are $100,000 or more will require a payment performance bond.

Specification Manual: Yes
Sheet Size: 30 x 42

ADDENDA:
  • Addendum #1 - Date Added: Feb 27, 2018

Contractors

Notes: Address your bids, Attn: Cypress Bay HS Sealed Bid
1450 Centrepark Blvd, Suite 260
West Palm Beach, FL 33401

Fax: 561-785-5750

Project Manager
Estimating - The Morganti Group, Inc.
Phone: (561) 689-0200
Fax: 561-689-4774
Email: Click Here to Email


Project Files

Select which prints you want to purchase

Drawings for this project are in the categories listed below. To purchase a complete set of prints by set, please check the box beside the set. To purchase a partial set, click on "Show files" and check the boxes next to the desired drawings. Clicking on the drawing name will open a preview of the drawing. Please be sure the boxes are checked beside the prints to be shipped.

Specifications are available. Please select which divisions you want to purchase

Division 0
Division 1
Division 2
Division 3
Division 4
Division 5
Division 6
Division 7
Division 8
Division 9
Division 10
Division 11
Division 12
Division 13
Division 14
Division 15
Division 16
Division 17
Division 18
Division 19
Division 20
Division 21
Division 22
Division 23
Division 24
Division 25
Division 26
Division 27
Division 28
Division 29
Division 30
Division 31
Division 32
Division 33